A water supply system using VAG valves was built at the technical college in Bavaria - Germany.

The 16 and 17-year-old students put into practice what they had learned in the fields of “Installing a house connection” and “Extraction, storage and distribution of water”.
The basis of the water system installed was a drawing and a pipeline system plan provided by VAG-Armaturen GmbH.
During the inauguration ceremony, Chief Administrative Office Leo Schrell expressed his appreciation that this concerted action provided the students with high-quality training material.
VAG-Armaturen GmbH
Carl-Reuther-Str. 1
68305 Mannheim
Germany
Phone +49 621 7490
Fax +49 621 749291000
info@vag-group.com